info@faujdargreeninfra.com +91 86191 60572 Mon - Sat: 9:00 AM - 6:00 PM
Industrial

Pharma Unit Clean Power Setup

EcoTech 3, Greater Noida

Installed Capacity
250 kW

Project Overview

Engineered clean energy infrastructure to support critical drug manufacturing refrigeration lines with backup solar generation.

Project Specifications

  • City / State: Greater Noida, Uttar Pradesh
  • Capacity: 250 kW
  • Completion: Feb 2024
  • Category: Industrial

Project Enquiry Form

Interested in a similar Solar EPC or Green Infrastructure setup? Send us your inquiry below.